A battery installation of 15 MW and 30 MWh in Logrosán, Cáceres, first authorisation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.
In the gazette
| Battery power | 15 MW net, 17.5 MW installed; the net figure from BOE-A-2025-25995: “io de 2022, autorización administrativa previa para el módulo de almacenamiento Zurbarán, de 17,5 MWp y 15 MWn” |
| Storage | 30 MWh |
| Hours at full power | 2.0 |
| Promoter | Baylio Solar, SLU |
| Configuration | Added to a plant |
| Plant it is added to | FV Zurbarán, 38.9 MW, solar |
| Access capacity | 34.4 MW |
| Municipality | Logrosán |
| Province | Cáceres |
| Substation | Valdecaballeros 400 kV |
| Step reached | First authorisation |
Every act, oldest first
| Published | What the act does | Authority | Act |
|---|---|---|---|
| 1 Apr 2023 | Public consultation; 30 MWh | Delegación del Gobierno en Extremadura (Área de Industria y Energía) | BOE-B-2023-9708 |
| 18 Dec 2025 | First authorisation (autorización administrativa previa); 15 MW, 30 MWh | Ministry for the Ecological Transition, Directorate-General for Energy Policy and Mines | BOE-A-2025-25995 |
Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.