Vitreous LabsEnergy transparency

Storage at Puertollano II

A battery installation of 5 MW and 22.8 MWh in Puertollano, Ciudad Real, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power5 MW
Storage22.8 MWh
Hours at full power4.6
PromoterIberdrola Renovables Castilla La Mancha, SA
ConfigurationAdded to a plant
Plant it is added toPuertollano II, 89.9 MW, solar
Access capacity80 MW
MunicipalityPuertollano
ProvinceCiudad Real
SubstationELCOGAS 220 kV
Step reachedAuthorised to build

This installation is registered to trade on OMIE as Puertollano, traded by Iberdrola Energía España.

Every act, oldest first

PublishedWhat the act doesAuthorityAct
2 Dec 2021First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 5 MW, 22.8 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2021-19986

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.