Vitreous LabsEnergy transparency

BESS Hibridación FV Andévalo

A battery installation of 26.4 MW and 59.9 MWh in Puebla de Guzmán, Huelva, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power26.4 MW
Storage59.9 MWh
Hours at full power2.3
PromoterIberdrola Renovables Andalucía, SAU
ConfigurationAdded to a plant
Plant it is added toFV Andévalo, 42.6 MW, solar
Access capacity26.4 MW
MunicipalityPuebla de Guzmán
ProvinceHuelva
SubstationPuebla de Guzmán 220 kV
Step reachedAuthorised to build

This installation is registered to trade on OMIE as Andévalo, traded by Iberdrola Energía España.

Every act, oldest first

PublishedWhat the act doesAuthorityAct
13 Jul 2024Public consultation; 26.4 MWSubdelegación del Gobierno en HuelvaBOE-B-2024-26379
15 Sep 2025First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 26.4 MW, 59.9 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2025-18285

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Iberdrola Renovables Andalucía, SAU