HIB. SAE PILETAS I
A battery installation of 6.3 MW and 12.9 MWh in Agüimes, Las Palmas, first authorisation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.
In the gazette
| Battery power | 6.3 MW |
| Storage | 12.9 MWh |
| Hours at full power | 2.1 |
| Promoter | Naturgy Renovables, S.L.U. |
| Configuration | Added to a plant |
| Plant it is added to | Piletas I, 12.8 MW, wind |
| Municipality | Agüimes |
| Province | Las Palmas |
| Step reached | First authorisation |
Every act, oldest first
| Published | What the act does | Authority | Act |
|---|---|---|---|
| 31 Jul 2024 | Public consultation; 6.3 MW, 12.9 MWh | Gobierno de Canarias, Dirección General de Energía | BOE-B-2024-27922 |
| 5 May 2025 | First authorisation (autorización administrativa previa), declaration of public utility; 6.3 MW, 12.9 MWh | Gobierno de Canarias (DG Energía) | BOE-B-2025-15994 |
Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.