Vitreous LabsEnergy transparency

BESS Los Frailes

A battery installation of 40 MW and 160 MWh in Badajoz, Badajoz, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power40 MW
Storage160 MWh
Hours at full power4.0
PromoterRalos Investment Fotovoltaico Sur, S.L.
ConfigurationAdded to a plant
Plant it is added toPFV Los Frailes, 47.4 MW, solar
Access capacity40.2 MW
MunicipalityBadajoz
ProvinceBadajoz
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
28 Jul 2026Public consultation; 40 MW, 160 MWhDelegación del Gobierno en ExtremaduraBOE-B-2026-25450

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Ralos Investment Fotovoltaico Sur, S.L.