Planta de Almacenamiento Frontones

A battery installation of 4 MW and 9.2 MWh in Corral Rubio, Albacete, first authorisation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power4 MW
Storage9.2 MWh
Hours at full power2.3
PromoterElawan Eólica Frontones, SL
ConfigurationAdded to a plant
Plant it is added toFrontones, 50 MW, wind
Access capacity50 MW
MunicipalityCorral Rubio, Chinchilla de Montearagón
ProvinceAlbacete
SubstationCampanario 400 kV
Step reachedFirst authorisation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
5 Dec 2023Public consultation; 4 MWSubdelegación del Gobierno en AlbaceteBOE-B-2023-36684
30 Jan 2025Environmental decision; 4 MWMinistry for the Ecological Transition, Directorate-General for Environmental Quality and AssessmentBOE-A-2025-1720
28 May 2025First authorisation (autorización administrativa previa); 4 MW, 9.2 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2025-10584

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Elawan Eólica Frontones, SL