Vitreous LabsEnergy transparency

Agatha

A battery installation of 39.6 MW in Alcalá de Guadaira, Sevilla, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power39.6 MW
PromoterAgatha Energía, S.L.
ConfigurationAdded to a plant
Plant it is added toAgatha, 46.2 MW, solar
MunicipalityAlcalá de Guadaira
ProvinceSevilla
SubstationDon Rodrigo 400 kV
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
23 Apr 2026Public consultation; 39.6 MWSubdelegación del Gobierno en SevillaBOE-B-2026-12664

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Agatha Energía, S.L.