Storage at P.E. San Blas

A battery installation of 20 MW in Valverde de Campos, Valladolid, refused, withdrawn or rejected. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power20 MW
PromoterNaturgy Renovables, SLU
ConfigurationAdded to a plant
Plant it is added toP.E. San Blas, 39.6 MW, wind
MunicipalityValverde de Campos, Castromonte
ProvinceValladolid
Step reachedRefused, withdrawn or rejected

Every act, oldest first

PublishedWhat the act doesAuthorityAct
18 Aug 2026Withdrawal, the promoter’s or the State’s; 20 MWMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-17910

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.