A battery installation of 30 MW and 60 MWh in Fregenal de la Sierra, Badajoz, first authorisation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power30 MW net, 38.5 MW installed; the net figure from BOE-B-2023-4648: “ción para la instalación "Infraestructura de almacenamiento de energía eléctrica BETURIA" de 38,5 MWp y 30 MWn”
Storage60 MWh
Hours at full power1.6
PromoterDehesa de los Guadalupes Solar, SLU
ConfigurationAdded to a plant
Plant it is added toFV Beturia, 43.5 MW, solar
Access capacity41.3 MW
MunicipalityFregenal de la Sierra
ProvinceBadajoz
SubstationBrovales 400 kV
Step reachedFirst authorisation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
14 Feb 2023Public consultation; 30 MW, 60 MWhDelegación del Gobierno en ExtremaduraBOE-B-2023-4648
25 Aug 2025First authorisation (autorización administrativa previa); 38.5 MW, 60 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2025-17150

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.