Mimas Solar
A battery installation of 20 MW and 80 MWh in Peralveche, Guadalajara, environmental decision. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.
In the gazette
| Battery power | 20 MW |
| Storage | 80 MWh |
| Hours at full power | 4.0 |
| Promoter | Solaria Promoción y Desarrollo Fotovoltaico, SLU |
| Configuration | Added to a plant |
| Plant it is added to | Mimas Solar, solar |
| Municipality | Peralveche |
| Province | Guadalajara |
| Substation | Trillo 400 kV |
| Step reached | Environmental decision |
Every act, oldest first
| Published | What the act does | Authority | Act |
|---|---|---|---|
| 27 Feb 2026 | Environmental decision; 20 MW, 80 MWh | Ministry for the Ecological Transition, Directorate-General for Environmental Quality and Assessment | BOE-A-2026-4646 |
Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.
All installations · On the map · Solaria Promoción y Desarrollo Fotovoltaico, SLU