A battery installation of 100 MW and 200 MWh in Atalaya de Cañavate, Cuenca, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power100 MW
Storage200 MWh
Hours at full power2.0
PromoterGeneración Eólica Castilla-La Mancha, SL
ConfigurationAdded to a plant
Plant it is added toGecama, 329 MW, solar and wind
Access capacity300 MW
MunicipalityAtalaya de Cañavate, Tébar, Cañada Juncosa
ProvinceCuenca
SubstationMinglanilla 400 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
14 Jul 2025First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción), declaration of public utility; 100 MW, 200 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2025-14561