A battery installation of 100 MW and 200 MWh in Atalaya de Cañavate, Cuenca, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.
In the gazette
| Battery power | 100 MW |
| Storage | 200 MWh |
| Hours at full power | 2.0 |
| Promoter | Generación Eólica Castilla-La Mancha, SL |
| Configuration | Added to a plant |
| Plant it is added to | Gecama, 329 MW, solar and wind |
| Access capacity | 300 MW |
| Municipality | Atalaya de Cañavate, Tébar, Cañada Juncosa |
| Province | Cuenca |
| Substation | Minglanilla 400 kV |
| Step reached | Authorised to build |
Every act, oldest first
| Published | What the act does | Authority | Act |
|---|---|---|---|
| 14 Jul 2025 | First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción), declaration of public utility; 100 MW, 200 MWh | Ministry for the Ecological Transition, Directorate-General for Energy Policy and Mines | BOE-A-2025-14561 |
Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.