A battery installation of 27.6 MW and 59.9 MWh in Azaila, Teruel, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power27.6 MW
Storage59.9 MWh
Hours at full power2.2
PromoterIberdrola Renovables Aragón, SAU
ConfigurationAdded to a plant
Plant it is added toFV Teruel, 42.6 MW, solar
Access capacity38.1 MW
MunicipalityAzaila
ProvinceTeruel
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
31 May 2024Public consultation; 27.6 MW, 59.9 MWhSubdelegación del Gobierno en Teruel, Dependencia del Área de Industria y EnergíaBOE-B-2024-19767
20 Oct 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 27.6 MW, 59.9 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-21858

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.