Tesouro Storage

A battery installation of 17.5 MW and 37 MWh in As Pontes de García Rodríguez, A Coruña, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power17.5 MW
Storage37 MWh
Hours at full power2.1
PromoterEnel Green Power España, SL
ConfigurationAdded to a plant
Plant it is added toTesouro, 50.4 MW, wind
Access capacity60 MW
MunicipalityAs Pontes de García Rodríguez
ProvinceA Coruña
SubstationPuentes G.R. 400 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
28 Apr 2026Public consultation; 17.5 MW, 37 MWhDelegación del Gobierno en GaliciaBOE-B-2026-13398
19 Oct 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 17.5 MW, 37 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-21769

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Enel Green Power España, SL