A battery installation of 19.8 MW and 46.7 MWh in Tabernas, Almería, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power19.8 MW
Storage46.7 MWh
Hours at full power2.4
PromoterNaturgy Renovables, SLU
ConfigurationAdded to a plant
Plant it is added toTabernas II, 48.8 MW, solar
Access capacity45 MW
MunicipalityTabernas
ProvinceAlmería
SubstationTabernas 220 kV
Step reachedAuthorised to build

This installation is registered to trade on OMIE as Tabernas II, traded by Naturgy (Gas Natural Comercializadora).

Every act, oldest first

PublishedWhat the act doesAuthorityAct
25 Sep 2024Public consultation; 19.8 MW, 46.7 MWhSubdelegación del Gobierno en AlmeríaBOE-B-2024-33919
13 Oct 2026First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 19.8 MW, 46.7 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2026-21303