Vitreous LabsEnergy transparency

ALM Baterías

A battery installation of 15 MW in Belvís de Monroy, Cáceres, authorised to build. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power15 MW
PromoterIberdrola Generación, SAU
ConfigurationAdded to a plant
Plant it is added toValdecañas, hydro
Access capacity15 MW
MunicipalityBelvís de Monroy, Valdecañas de Tajo
ProvinceCáceres
SubstationAlmaraz E.T. 220 kV
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
18 Jan 2023Public consultation; 15 MWDelegación del Gobierno en ExtremaduraBOE-B-2023-1502
7 Mar 2024First authorisation (autorización administrativa previa), authorisation to build (autorización administrativa de construcción); 15 MWMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2024-4483

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map  ·  Iberdrola Generación, SAU