A battery installation of 30 MW and 60 MWh in Logrosán, Cáceres, first authorisation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power30 MW net, 38.5 MW installed; the net figure from BOE-A-2025-25996: “o de 2022, autorización administrativa previa para el módulo de almacenamiento «Quijote», de 38,5 MWp y 30 MWn”
Storage60 MWh
Hours at full power2.0
PromoterFuratena Solar 1, SLU
ConfigurationAdded to a plant
Plant it is added toFV Quijote, 38.9 MW, solar
Access capacity34.4 MW
MunicipalityLogrosán
ProvinceCáceres
SubstationValdecaballeros 400 kV
Step reachedFirst authorisation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
31 Mar 2023Public consultation; 60 MWhDelegación del Gobierno en Extremadura, Área de Industria y EnergíaBOE-B-2023-9374
18 Dec 2025First authorisation (autorización administrativa previa); 30 MW, 60 MWhMinistry for the Ecological Transition, Directorate-General for Energy Policy and MinesBOE-A-2025-25996

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.