Herrera de los Navarros

A battery installation of 35.1 MW and 70.2 MWh in Herrera de los Navarros, Zaragoza, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power35.1 MW
Storage70.2 MWh
Hours at full power2.0
PromoterSistemas Energéticos Barandón, S.L.
ConfigurationAdded to a plant
Plant it is added toHerrera de los Navarros, 35 MW, solar and wind
MunicipalityHerrera de los Navarros
ProvinceZaragoza
SubstationFuendetodos 220 kV
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
18 Jun 2026Public consultation; 35.1 MW, 70.2 MWhSubdelegación del Gobierno en ZaragozaBOE-B-2026-20706

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.