Belgium · the batteries
Storm Zeebrugge
Announced, 100 MW · 400 MWh, in Bruges, owned by Storm. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 100 MW |
| Capacity | 400 MWh |
| Duration | 4.0 hours |
| Status | Announced, as of 19 October 2026 |
| Municipality | Bruges, Zeebrugge, West Flanders |
| Placed on the map | at Zeebrugge (GeoNames) |
Who is behind it
| Owner | Storm |
Not published anywhere we have found: ultimate owner, developer, traded by, built by. The page says so rather than guessing.
Not in Elia’s list
Elia does not schedule this battery, because it is not yet running.
What the sources say
Described by Storm as ready to build.
Evidence and sources
From the owners’, developers’ and builders’ own releases and the trade press, read by Vitreous, joined to Elia’s list by name. This page carries no money: no Belgian body publishes what a named battery earns. List id BE-B32.