Belgium · the batteries

Harmignies Energy Storage

In Elia’s schedule, start not announced, 75 MW · 300 MWh, in Mons, owned by Energy Solutions Group. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power75 MW
Capacity300 MWh
Duration4.0 hours
StatusIn Elia’s schedule, start not announced, as of 19 October 2026
Owner’s date2025, expected by the owner in the fourth quarter of 2025
MunicipalityMons, Harmignies, Hainaut
Grid connectionElia, the high voltage substation beside the site
Placed on the mapat the site itself, as mapped on OpenStreetMap (Harmignies BESS)

Who is behind it

OwnerEnergy Solutions Group
Ultimate ownerPatronale Life (majority)
Built byTesla (82 Megapack 2XL)

Not published anywhere we have found: developer, traded by. The page says so rather than guessing.

In Elia’s list

Elia schedules this battery under the name below. Elia usually starts scheduling a battery when it begins testing, so the first day here is when it reached the grid, not when it began commercial operation.

Elia’s nameFirst listedLast listedPower, as Elia lists it
Harmignies Energy Storage BESS1 September 2025still listed75 MW from 1 September 2025, then 76 MW from 8 January 2026

Elia Transmission Belgium, open data dataset ods179, Elia Open Data Licence.

What the sources say

Elia has scheduled it since the start of September 2025, at 75 MW and then 76.3 MW. No release found from the owner saying it has started commercial operation. The newest pages found still describe it as being built, due in autumn 2025.