Storm Langerlo

Being built, 100 MW · 400 MWh, in Genk, owned by Storm. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power100 MW
Capacity400 MWh
Duration4.0 hours
StatusBeing built, as of 19 October 2026
Owner’s date2027, expected in the second half of 2027
MunicipalityGenk, Langerlo, Limburg
Grid connectionElia, André Dumont substation
Placed on the mapat the site itself, as mapped on OpenStreetMap (Batterijpark Storm - Langerlo)

Who is behind it

OwnerStorm
Ultimate ownerwith TINC, PMV and I4B
Traded byEneco
Built byTesla

Not published anywhere we have found: developer. The page says so rather than guessing.

Not in Elia’s list

Elia does not schedule this battery, because it is not yet running.

What the sources say

Elia’s connection was built by March 2026. The sources give dates from early to the end of 2027 for the start.