Storm Ruien

Being built, 200 MW · 800 MWh, in Kluisbergen, owned by Storm. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power200 MW
Capacity800 MWh
Duration4.0 hours
StatusBeing built, as of 19 October 2026
Owner’s date2027, expected in autumn 2027
MunicipalityKluisbergen, Ruien, East Flanders
Grid connectionElia, by cable under the Scheldt to Avelgem
Placed on the mapat the site itself, as mapped on OpenStreetMap (Batterijpark Ruien)

Who is behind it

OwnerStorm
Ultimate ownerwith TINC, PMV and I4B
Traded byEneco
Built byTesla

Not published anywhere we have found: developer. The page says so rather than guessing.

Not in Elia’s list

Elia does not schedule this battery, because it is not yet running.