Vitreous LabsEnergy transparency
Belgium · the batteries

Katoen Natie Kallo

In Elia’s schedule, start not announced, 10 MW, in Beveren, owned by Katoen Natie. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power10 MW
StatusIn Elia’s schedule, start not announced, as of 19 October 2026
MunicipalityBeveren, Kallo, East Flanders
Grid connectionElia
Placed on the mapat Kallo, the place its source names, in Beveren (GeoNames)

Who is behind it

OwnerKatoen Natie

Not published anywhere we have found: ultimate owner, developer, traded by, built by. The page says so rather than guessing.

In Elia’s list

Elia schedules this battery under the name below. Elia usually starts scheduling a battery when it begins testing, so the first day here is when it reached the grid, not when it began commercial operation.

Elia’s nameFirst listedLast listedPower, as Elia lists it
Katoen Natie Bulk Terminal Kallo BESS 121 May 2026still listed5 MW from 21 May 2026
Katoen Natie Bulk Terminal Kallo BESS 222 May 2026still listed5 MW from 22 May 2026

Elia Transmission Belgium, open data dataset ods179, Elia Open Data Licence.

What the sources say

Two units of 5 MW in Elia’s list, from May 2026, at Katoen Natie’s bulk terminal. Alfen says Katoen Natie has nearly 100 MWh of batteries across five Belgian sites but names none, so the capacity of this one is not stated. Everything about this battery rests on Elia’s list.