ENGIE Vilvoorde phase 3

Announced, 100 MW · 400 MWh, in Vilvoorde, owned by ENGIE (Electrabel). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power100 MW
Capacity400 MWh
Duration4.0 hours
StatusAnnounced, as of 19 October 2026
MunicipalityVilvoorde, Flemish Brabant
Placed on the mapat the centre of Vilvoorde, its municipality (GeoNames)

Who is behind it

OwnerENGIE (Electrabel)

Not published anywhere we have found: ultimate owner, developer, traded by, built by. The page says so rather than guessing.

Not in Elia’s list

Elia does not schedule this battery, because it is not yet running.

What the sources say

ENGIE said a decision was due in early 2026; no decision found.