Nyrstar Balen

In Elia’s schedule, start not announced, 25 MW · 100 MWh, in Balen, owned by Nala Renewables. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power25 MW
Capacity100 MWh
Duration4.0 hours
StatusIn Elia’s schedule, start not announced, as of 19 October 2026
Owner’s date2022, expected by the owner by the end of 2022
MunicipalityBalen, Antwerp
Grid connectionElia, at the Nyrstar zinc smelter’s connection
Placed on the mapat the centre of Balen, its municipality (GeoNames)

Who is behind it

OwnerNala Renewables
Ultimate ownerTrafigura and IFM Investors (joint venture)

Not published anywhere we have found: developer, traded by, built by. The page says so rather than guessing.

In Elia’s list

Elia schedules this battery under the name below. Elia usually starts scheduling a battery when it begins testing, so the first day here is when it reached the grid, not when it began commercial operation.

Elia’s nameFirst listedLast listedPower, as Elia lists it
Nyrstar Belgium Balen BESS 11 November 2025still listed15 MW from 1 November 2025
Nyrstar Belgium Balen BESS 21 November 2025still listed10 MW from 1 November 2025

Elia Transmission Belgium, open data dataset ods179, Elia Open Data Licence.

What the sources say

Two units in Elia’s list, 15 MW and 10 MW, both from the start of November 2025, about three years after the owner’s stated start. No release found saying it has started commercial operation.