Vitreous LabsEnergy transparency

Hanhals

Operating, 15 MW · 15 MWh, in Kungsbacka (SE3), owned by Ellevio Energy Solutions. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power15 MW
Capacity15 MWh
Duration1.0 hours
StatusOperating, as of 25 November 2024
Owner’s dateMay 2024, actual
MunicipalityKungsbacka
Bidding zoneSE3, Stockholm
Placed on the mapat Hanhals, the place its name carries (GeoNames)

Who is behind it

OwnerEllevio Energy Solutions
Ultimate ownerEllevio
DeveloperEllevio Energy Solutions
Traded byFlower
Built byAlfen (TheBattery Elements)

Not published anywhere we have found: cells.

What the sources say

Ellevio gave 15 MW and 15.7 MWh in January 2023 (Ellevio); Alfen 15 and 15. Flower said in August 2024 it optimises it; owned by Ellevio Energy Solutions.

Evidence and sources

From the owners’, developers’ and builders’ own releases and the press, read by Vitreous. Svenska kraftnät publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in each reserve market is on the markets page, for the market as a whole. List id SE-B007.

All batteries  ·  On the map