Storen Power Reserve

Operating, 52 MW · 52 MWh, in Ragunda (SE2), owned by Neoen. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power52 MW
Capacity52 MWh
Duration1.0 hours
StatusOperating, as of 3 September 2025
Owner’s date17 June 2024, actual
MunicipalityRagunda
Bidding zoneSE2, Sundsvall
Placed on the mapat Ragunda, the seat of its municipality (GeoNames)

Who is behind it

OwnerNeoen
DeveloperNeoen
Built byNidec

Not published anywhere we have found: ultimate owner, traded by, cells.

What the sources say

Announced at 40 MW and 40 MWh in January 2023 (Nidec); Neoen gives 52 MW and 52 MWh at its inauguration in June 2024, six km from Isbillen.

Evidence and sources

From the owners’, developers’ and builders’ own releases and the press, read by Vitreous. Svenska kraftnät publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in each reserve market is on the markets page, for the market as a whole. List id SE-B002.

All batteries  ·  On the map