Sweden · the named batteries
Humlestaden, Göteborg (reused car batteries)
Operating, 2.8 MW · 2.6 MWh, in Göteborg (SE3). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 2.8 MW |
| Capacity | 2.6 MWh |
| Duration | 0.9 hours |
| Status | Operating, as of 16 October 2023 |
| Owner’s date | July 2023, actual |
| Municipality | Göteborg |
| Bidding zone | SE3, Stockholm |
| Placed on the map | at Göteborg, the seat of its municipality (GeoNames) |
Who is behind it
| Built by | Batteryloop (Stena Recycling) |
Not published anywhere we have found: owner, ultimate owner, developer, traded by, cells.
What the sources say
2.8 MW and 2.6 MWh usable, from reused Mercedes-Benz car batteries, running since mid summer 2023. Owner not named.
Evidence and sources
- name, municipality, builder, power, capacity, bidding zone, status: electrive.com/es/2023/10/16/gothenburg-now-boosts-2-8-mw-syst…
From the owners’, developers’ and builders’ own releases and the press, read by Vitreous. Svenska kraftnät publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in each reserve market is on the markets page, for the market as a whole. List id SE-B064.