Haninge (Polar Capacity)

Operating, 20 MW, in Haninge (SE3), owned by Polar Capacity and Stockholm Exergi. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power20 MW
StatusOperating, as of 9 November 2023
Owner’s dateOctober 2023, actual
MunicipalityHaninge
Bidding zoneSE3, Stockholm
Placed on the mapat Haninge, the seat of its municipality (GeoNames)

Who is behind it

OwnerPolar Capacity and Stockholm Exergi
DeveloperPolar Structure
Traded byStockholm Exergi
Built byADS-TEC Energy

Not published anywhere we have found: ultimate owner, cells.

What the sources say

"Over 20 MW" in eight containers (ADS-TEC); unveiled 6 October 2023. MWh not stated; the first step of a planned 100 MW with Stockholm Exergi.

Evidence and sources

From the owners’, developers’ and builders’ own releases and the press, read by Vitreous. Svenska kraftnät publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in each reserve market is on the markets page, for the market as a whole. List id SE-B046.