Rättvik (Ingrid and Locus)

Operating, 12 MW · 12 MWh, in Rättvik (SE3), owned by Ingrid Capacity and Locus Energy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power12 MW
Capacity12 MWh
Duration1.0 hours
StatusOperating, as of 25 September 2025
Owner’s date24 September 2025, actual
MunicipalityRättvik
Bidding zoneSE3, Stockholm
Placed on the mapat Rättvik, the seat of its municipality (GeoNames)

Who is behind it

OwnerIngrid Capacity and Locus Energy
DeveloperIngrid Capacity
Traded byIngrid Capacity

Not published anywhere we have found: ultimate owner, built by, cells.

What the sources say

Owned jointly by Ingrid and Locus Energy, a company of the SEB Nordic Energy fund (Ingrid, 4 December 2025). The partnership was announced in September 2024 as 13 batteries of 196 MW in SE3 and SE4, of 8 to 20 MW each; Ingrid gave the portfolio as 172 MW and 240 MWh in September 2025. Inaugurated on 24 September 2025, six months from ground breaking.

Evidence and sources

From the owners’, developers’ and builders’ own releases and the press, read by Vitreous. Svenska kraftnät publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in each reserve market is on the markets page, for the market as a whole. List id SE-B029.