Vitreous LabsEnergy transparency

Bullerforsen

Operating, 20 MW · 20 MWh (SE3), owned by Centrica. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power20 MW
Capacity20 MWh
Duration1.0 hours
StatusOperating, as of 15 April 2026
Owner’s dateApril 2026, actual
Bidding zoneSE3, Stockholm
Placed on the mapnot placed: no municipality in any source

Who is behind it

OwnerCentrica
DeveloperFu-Gen
Traded byCentrica Energy
Built byOmexom

Not published anywhere we have found: ultimate owner, cells.

What the sources say

One of two Centrica batteries of 20 MW and 20 MWh each, built from projects bought ready to build from Fu-Gen in September 2024; Centrica announced both energised in April 2026, while Omexom, the builder, says both ran by the end of 2025. Centrica Energy trades them. Its municipality is not stated: Energy-Storage.news puts both in Borlänge, ESS News one north of Stockholm, Omexom both in Dalarna.

Evidence and sources

From the owners’, developers’ and builders’ own releases and the press, read by Vitreous. Svenska kraftnät publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in each reserve market is on the markets page, for the market as a whole. List id SE-B043.

All batteries  ·  On the map