Yllikkälä Power Reserve Two

Operating, 56 MW · 113 MWh, in Lappeenranta, owned by Neoen (100%). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power56 MW
Capacity113 MWh
Duration2.0 hours
StatusOperating, as of 4 March 2026
Owner’s date2025 H1, actual
MunicipalityLappeenranta
Grid connectionFingrid Yllikkälä substation, underground cable
Placed on the mapat Yllikkälä, the place its name carries (GeoNames)

Who is behind it

OwnerNeoen (100%)
DeveloperNeoen
Built byNidec (overall responsibility; containers, cells, inverters); Destia (earthworks, foundations, 110 kV cabling)

Neoen SA, France. YTJ lists Neoen Storage Finland 1 Oy (3100878-5), 2 Oy (3364065-3), 3 Oy (3529064-2) and IV Oy (3553178-4), but no source read says which holds this battery.

Not published anywhere we have found: ultimate owner, cells. The page says so rather than guessing.

What the sources say

Nidec supplied the cells; the cell manufacturer is not named. Destia (4 Mar 2026) says it was put into operation in the first half of 2025.

Evidence and sources

From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B011.