Korkeamaa wind farm BESS (OX2)

Being built, 110 MW · 220 MWh, in Soini, owned by OX2. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power110 MW
Capacity220 MWh
Duration2.0 hours
StatusBeing built, as of 12 October 2026
Owner’s date2028, expected
MunicipalitySoini
Placed on the mapat the centre of Soini, its municipality (GeoNames)

Who is behind it

OwnerOX2
DeveloperOX2

No source names the company that holds it. Possible project company in YTJ, by name only: Korkeamaa BESS Oy (3539495-1).

Not published anywhere we have found: ultimate owner, built by, cells. The page says so rather than guessing.

What the sources say

CORRECTED 12 Oct 2026: size was 125 MW / 250 MWh from ESS News, which had Korkeamaa and Kannisto the wrong way round. OX2's own project pages give Korkeamaa 110 MW (220 MWh). OX2 (25 Feb 2026): both storages in operation in 2028, OX2 keeps them, Statkraft optimises. OX2 Finnish page: battery units to be installed early 2027.

Evidence and sources

From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B022.