Vitreous LabsEnergy transparency

Olana Turku

Operating, 5 MW · 6 MWh, in Turku, owned by Olana Energy Oy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power5 MW
Capacity6 MWh
Duration1.2 hours
StatusOperating, as of 11 October 2026
Owner’s date2025 Q1, actual
MunicipalityTurku
Grid connectionCaruna distribution grid
Placed on the mapat the centre of Turku, its municipality (GeoNames)

Who is behind it

OwnerOlana Energy Oy
DeveloperOlana Energy
Built byOlana Energy Construction (in-house)
Business ID3376259-7

YTJ, by exact name: Olana Energy Oy. https://avoindata.prh.fi/opendata-ytj-api/v3/companies?businessId=3376259-7

Not published anywhere we have found: ultimate owner, cells. The page says so rather than guessing.

What the sources say

Pilot project.

Evidence and sources

From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B007.