Vitreous LabsEnergy transparency

Teuva wind farm battery (EPV Energy)

Being built, 12 MW · 12 MWh, in Teuva, owned by EPV Energy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power12 MW
Capacity12 MWh
Duration1.0 hours
StatusBeing built, as of 31 May 2022
Owner’s date2023 spring, expected
MunicipalityTeuva
Grid connectionWind farm's existing substation
Placed on the mapat the centre of Teuva, its municipality (GeoNames)

Who is behind it

OwnerEPV Energy
Built byAlfen (TheBattery Elements)
Business ID0216734-9

YTJ: EPV Energia Oy (EPV Energy Ltd). https://avoindata.prh.fi/opendata-ytj-api/v3/companies?businessId=0216734-9

Not published anywhere we have found: ultimate owner, developer, cells. The page says so rather than guessing.

What the sources say

Foundations under way May 2022; commissioning planned spring 2023 with black start for the wind farm. EPV's page (read 12 Oct 2026, undated) still says "under construction". No source read confirms completion. The Alfen link comes from Energy-Storage.news (31 May 2022).

Evidence and sources

From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B038.

All batteries  ·  On the map