Vitreous LabsEnergy transparency

Valkeakoski (Alpiq)

Operating, 30 MW · 36 MWh, in Valkeakoski, owned by Alpiq. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power30 MW
Capacity36 MWh
Duration1.2 hours
StatusOperating, as of 2026-02
Owner’s dateOctober 2025, actual
MunicipalityValkeakoski
Grid connectionFingrid grid
Placed on the mapat the centre of Valkeakoski, its municipality (GeoNames)

Who is behind it

OwnerAlpiq
DeveloperMerus Power
Built byMerus Power (full delivery, O&M)

Alpiq (Switzerland). YTJ lists Alpiq Finland Oy (3114085-8) but no source read says it holds this battery.

Not published anywhere we have found: ultimate owner, cells. The page says so rather than guessing.

What the sources say

Alpiq (11 Dec 2025): "In October, Alpiq commissioned its first own BESS (30 MW / Valkeakoski, Finland)". Merus says the first grid-forming storage in commercial use in the Nordics. Fingrid's magazine (25 Mar 2026) says it opened "last autumn".

Evidence and sources

From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B014.

All batteries  ·  On the map