Byers Brae (EDF01N)
28 MW, about 28 MWh (1 hour, from the capacity market de-rating class) in Stirlingshire and Fife. Everything on this page is read from published data for the 364 days to 23 September 2026, or is labelled as an estimate.
What it is
| Registered power | 28 MW response and reserve auction registration |
| Storage duration | 1.0 hours capacity market de-rating class |
| Charging zone | Stirlingshire and Fife |
| Connection site | West Lothian |
| Postcode | EH48 1JY |
| Balancing mechanism unit | none found under the codes we search |
Who owns it and who trades it
| Traded by | EDF Energy Limitedruns several sitesconfirmed, Elexon's register |
| Owned by | GRIDRESERVE LTD |
| Owner established from | capacity market registered holder |
| Ultimately | Gresham House Energy Storage Fund confirmed source |
How we know. The registered office of each company names Gresham House Asset Management, read company by company on 31 August 2026. The address alone would not settle it, because 875 companies sit at 5 New Street Square; the care of line naming the manager is the discriminator.
Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart
Before 31 March 2025 this battery sold as NFSE02 under F & S Energy Ltd. The handover shows in the register as a new code, not a renaming, and the old page keeps its record.
Until 19 August 2026 this battery sold as BYBRB-1 under OCTOPUS ENERGY TRADING LIMITED, taking £113k inside this page's year. The handover shows in the register as a new code, not a renaming, and the old page keeps its record.
What it earned
| Line | 364 days to 23 September 2026 |
|---|---|
| Balancing mechanism | not published |
| Response and reserve auctions auction implied | £279k |
| Capacity market | £83k |
| Three lines together | £362k |
Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method
Outside the balancing mechanism, derived from the meter
Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its response and reserve delivery, and its losses, together. That position is valued here at the market index for each half hour. The volumes are measured. The price is a public benchmark, not this unit's trade. The product is derived, and is shown apart from the three measured lines above. 59 days to 12 September 2026, 37 of them still provisional in Elexon's settlement runs. Method and caveats
| Line | MWh or £ |
|---|---|
| Metered export, what crossed the meter out | 0 MWh |
| Metered import, what crossed the meter in | 5,505 MWh |
| Equivalent full cycles, everything sent out over one full charge | 0.0 over 59 days, 0.0 a year at that rate |
| Apparent meter to meter efficiency | 0%, not ordinary battery losses alone |
| Balancing offers accepted | 0 MWh |
| Balancing bids accepted | 0 MWh |
| Position outside balancing, export | 0 MWh |
| Position outside balancing, import | 5,505 MWh |
| Valued at the market index, sold | £0 |
| Valued at the market index, bought | £781k |
| Outside balancing, net, at the index | −£781k |
| Balancing and outside balancing together | −£781k £-172.60/kW/yr |
Checks this unit did not pass cleanly. Published anyway, because a flagged figure with its flag is more use than a blank.
- only 59 of 364 days metered
- returns only 0% of what it takes in, with 0 MWh exported all year, about 0 full power hours: a unit that barely cycles, where its own standing consumption and losses dominate a small throughput
- the meter exceeded the 28.0 MW registration on 16 days between 2026-07-28 and 2026-09-12, peaking at 0 MW export and 187 MW import: more than this battery can do, so another asset on the same meter, a commissioning period, or a settlement run error
Where it stands
| All three measured lineswhole fleet, £/kW/yr | 28th percentile197 units |
Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.
The nearest comparables
The five nearest in size in Scotland, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.
| Battery | MW | Hours | Measured, per kW |
|---|---|---|---|
| Braco | 9 | 1.5h | £120.6/kW/yr |
| Orchardbank | 9 | 1.5h | £85.2/kW/yr |
| Fordtown | 46 | 1h | £72.1/kW/yr |
| Whitelee 1 Battery | 50 | 1h | £33.6/kW/yr |
| Byers Brae (EDF01N)this battery | 28 | 1h | £13.0/kW/yr |
See it on the map
Every figure on this page traces to a published file. If something here is wrong about your asset, the methods section says how to tell us.