Byers Brae (EDF01N)

28 MW, about 28 MWh (1 hour, from the capacity market de-rating class) in Stirlingshire and Fife. Everything on this page is read from published data for the 364 days to 23 September 2026, or is labelled as an estimate.

What it is

Registered power28 MW response and reserve auction registration
Storage duration1.0 hours capacity market de-rating class
Charging zoneStirlingshire and Fife
Connection siteWest Lothian
PostcodeEH48 1JY
Balancing mechanism unitnone found under the codes we search

Who owns it and who trades it

Traded byEDF Energy Limitedruns several sitesconfirmed, Elexon's register
Owned byGRIDRESERVE LTD
Owner established fromcapacity market registered holder
UltimatelyGresham House Energy Storage Fund confirmed source

How we know. The registered office of each company names Gresham House Asset Management, read company by company on 31 August 2026. The address alone would not settle it, because 875 companies sit at 5 New Street Square; the care of line naming the manager is the discriminator.

Market registers name the party that sells into the market, which for a battery is usually an optimiser under contract rather than the owner. Elexon's balancing mechanism unit register names the seller here and the name is checked against it on every build. How we tell them apart

Before 31 March 2025 this battery sold as NFSE02 under F & S Energy Ltd. The handover shows in the register as a new code, not a renaming, and the old page keeps its record.

Until 19 August 2026 this battery sold as BYBRB-1 under OCTOPUS ENERGY TRADING LIMITED, taking £113k inside this page's year. The handover shows in the register as a new code, not a renaming, and the old page keeps its record.

What it earned

Line364 days to 23 September 2026
Balancing mechanismnot published
Response and reserve auctions auction implied£279k
Capacity market£83k
Three lines together£362k

Balancing is offer revenue and does not net off the cost of the power. The response and reserve figure is the value implied by the published auction results, award quantity times clearing price times the length of the delivery window, and not a settled payment. Capacity market income is the cleared price raised for inflation where the auction set a base period, split by month on EMRS's weights. Method

Outside the balancing mechanism, derived from the meter

Elexon publishes what this unit's meter recorded every half hour. Take away the balancing volumes NESO accepted and what is left is the position the unit ran outside the balancing mechanism: its wholesale trading, its response and reserve delivery, and its losses, together. That position is valued here at the market index for each half hour. The volumes are measured. The price is a public benchmark, not this unit's trade. The product is derived, and is shown apart from the three measured lines above. 59 days to 12 September 2026, 37 of them still provisional in Elexon's settlement runs. Method and caveats

LineMWh or £
Metered export, what crossed the meter out0 MWh
Metered import, what crossed the meter in5,505 MWh
Equivalent full cycles, everything sent out over one full charge0.0 over 59 days, 0.0 a year at that rate
Apparent meter to meter efficiency0%, not ordinary battery losses alone
Balancing offers accepted0 MWh
Balancing bids accepted0 MWh
Position outside balancing, export0 MWh
Position outside balancing, import5,505 MWh
Valued at the market index, sold£0
Valued at the market index, bought£781k
Outside balancing, net, at the index−£781k
Balancing and outside balancing together−£781k £-172.60/kW/yr

Checks this unit did not pass cleanly. Published anyway, because a flagged figure with its flag is more use than a blank.

  • only 59 of 364 days metered
  • returns only 0% of what it takes in, with 0 MWh exported all year, about 0 full power hours: a unit that barely cycles, where its own standing consumption and losses dominate a small throughput
  • the meter exceeded the 28.0 MW registration on 16 days between 2026-07-28 and 2026-09-12, peaking at 0 MW export and 187 MW import: more than this battery can do, so another asset on the same meter, a commissioning period, or a settlement run error

Where it stands

All three measured lineswhole fleet, £/kW/yr28th percentile197 units

Percentiles, so 90 means better than nine in ten of the cohort named beside it, on that measure alone, over the same 364 days. Rates are pounds per kilowatt per year, annualised over the days the unit has been on the system, the same figures the performance league ranks on. A high position in the taken-in table is not a fault: a constraint asset is paid to charge, and charging is its job.

The nearest comparables

The five nearest in size in Scotland, and this battery among them, ranked by what each was paid for every kilowatt it holds over the 364 days to the same date. They run for about the same length of time. Same market, same rules, same weather.

BatteryMWHoursMeasured, per kW
Braco91.5h£120.6/kW/yr
Orchardbank91.5h£85.2/kW/yr
Fordtown461h£72.1/kW/yr
Whitelee 1 Battery501h£33.6/kW/yr
Byers Brae (EDF01N)this battery281h£13.0/kW/yr