B1 Batterien CR01

6.5 MW, 38 MWh (5.9 hours) in Schenkenberg, Brandenburg, registered as operating since 14 May 2018. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as two units.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
B1 Batterien CR01SEE9143555859003.73.724 March 2023Lithiumchecked
Batteriespeicher Cremzow MaStR and owner disagreeSEE9632241114122.83514 May 2018Lithiumchecked

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
ENERTRAG Solarfeld Kreuz Uckermark GmbH & Co. KGAmtsgericht Neuruppin HRA 2439Schenkenberg, Brandenburg
Enel Green Power Cremzow GmbH & Co. KGAmtsgericht Neuruppin HRA 3189Schenkenberg, Brandenburg

We have not yet traced the owner behind ENERTRAG Solarfeld Kreuz Uckermark GmbH & Co. KG and Enel Green Power Cremzow GmbH & Co. KG. The commercial register holds it, and the owners page lists every family traced so far.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid company50Hertz Transmission GmbH
Connected atextra high voltage (220 or 380 kV)
MunicipalitySchenkenberg, district of Uckermark
StateBrandenburg
Land parcelCremzow, Flur 003 Flurstück 047; Schenkenberg, Flur 2 Flurstück 532
PermitLandkreis Uckermark, 63-02704-22-21
Registered position53.3645, 13.9710
Register locationSEL946360652124

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

Tender award

UnitAwardAnnouncedBidderMW bid
B1 Batterien CR01Inn20-1/013ENERTRAG Windfeld Hohenfelde V GmbH & Co. KG not today’s operator0

The innovation tenders pay a market premium to solar or wind paired with storage. The award lists are the Bundesnetzagentur’s. A bidder that differs from today’s operator dates a change of hands, or a spelling difference.

What has changed in the register

First registered on 15 October 2020; last changed in the register on 6 March 2025. No change has shown in our reads since the first, on 10 October 2026.

Doubts about this entry

MaStR and owner disagree. Batteriespeicher Cremzow, Enel Green Power, registered at 2.8 MW net power against 22 MW gross, with 34.6 MWh. Its builders announced it as a 22 MW battery (pv magazine, 20 May 2019, https://www.pv-magazine.com/2019/05/20/enertrag-enel-and-leclanche-commission-22-mw-storage-project-in-germany/). Counted at the register’s 2.8 MW, the power the operator declared for the grid.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.