Vitreous LabsEnergy transparency

Batteriepark Metelen

92 MW, 231 MWh (2.5 hours) in Metelen, Nordrhein-Westfalen, registered as operating since 10 March 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Batteriepark MetelenSEE9212223660439223110 March 2026Other batteryunder check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
Battery Park Metelen GmbHAmtsgericht München HRB 293169München, Bayern

Owner. Munich Re, through its asset manager MEAG, through MEAG, asset manager of Munich Re and ERGO. Reported in the trade press and not yet confirmed by the owner or the commercial register. Evidence: solarserver, 21 May 2026: "Mit der Übergabe gehen Eigentum und operative Verantwortung an MEAG über.". Checked 16 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

Owner, as publishedMEAG bought the 92.5 MW / 231 MWh Battery Park Metelen at ready-to-build stage MEAG / Entrix press release (pv magazine company news), 3 June 2025
Owner, as publishedOwnership and operational responsibility passed to MEAG at handover solarserver, 21 May 2026
Owner’s parentMEAG is the asset manager of Munich Re and ERGO Group MEAG / Entrix press release (pv magazine company news), 3 June 2025
Trades its outputEntrix optimises and markets the battery across all relevant markets; fully merchant MEAG / Entrix press release (pv magazine company news), 3 June 2025
ContractNo toll: the project runs fully merchant MEAG / Entrix press release (pv magazine company news), 3 June 2025
Built bySMA Altenso, original developer, turnkey EPC general contractor and ongoing O&M provider solarserver, 21 May 2026
Power, as the owner gives it92.5 MW solarserver, 21 May 2026
Energy, as the owner gives it231 MWh solarserver, 21 May 2026
In operation, as the owner gives itCommissioned and handed over to MEAG, reported 2026-05-21 (register first commissioning 2026-03-10) solarserver, 21 May 2026
Also publishedProject originally developed by SMA Altenso MEAG / Entrix press release (pv magazine company news), 3 June 2025
Also publishedCell maker not published: Cell maker not named; LFP battery platforms solarserver, 21 May 2026

From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.

Where it connects

Grid companyWestnetz GmbH
Connected atthe high to medium voltage transformer level
MunicipalityMetelen, district of Steinfurt
StateNordrhein-Westfalen
Land parcelMetelen, Flur 18 Flurstück 781 + 782
Registered position52.1542, 7.2270
Register locationSEL908717257055

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 18 March 2026; last changed in the register on 11 August 2026. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.