Batteriespeicher Jackerath

4.0 MW, 8.1 MWh (2 hours) in Grevenbroich, Nordrhein-Westfalen, registered as operating since 1 September 2023. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Batteriespeicher JackerathSEE9348422717414.08.11 September 2023Lithiumchecked

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
RWE Battery Solutions GmbHAmtsgericht Essen HRB 30749Essen, Nordrhein-Westfalen

Owner. RWE. From the owner’s own publication. Evidence: RWE website, PV-Speicher-Hybrid Inden: "Am Standort des Braunkohletagebaus Inden betreibt RWE eine Freiflächen-Photovoltaikanlage mit integriertem Speicher.". Checked 16 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyAmprion GmbH
Connected atextra high voltage (220 or 380 kV)
MunicipalityGrevenbroich, district of Rhein-Kreis Neuss
StateNordrhein-Westfalen
Land parcelKönigshoven, Hinweis! - (50181 Bedburg ist dem Rhein-Erft Kreis zuzuordnen und gehört nicht wie hier automatisch ausgefüllt zum Rhein-Kreis Neuss) Flur 1: 38; 39; 40; 42; 79; 80; 99; 101; 103. Flur 2: 21; 34; 37. Flur 3: 76; 91; 108; 103/1.
Registered position51.0382, 6.4867
Register locationSEL964700814339

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

Tender award

UnitAwardAnnouncedBidderMW bid
Batteriespeicher JackerathInn21-2/022RWE Battery Solutions GmbH0

The innovation tenders pay a market premium to solar or wind paired with storage. The award lists are the Bundesnetzagentur’s. A bidder that differs from today’s operator dates a change of hands, or a spelling difference.

What has changed in the register

First registered on 16 October 2023; last changed in the register on 6 March 2025. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.