Vitreous LabsEnergy transparency

Batteriespeicher JT Energy Systems GmbH

25 MW, 23 MWh (0.9 hours) in Bobritzsch-Hilbersdorf, Sachsen, registered as operating since 1 September 2022. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Batteriespeicher JT Energy Systems GmbHSEE90582092172925231 September 2022Lithiumunder check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
JT Energy Systems GmbHAmtsgericht Chemnitz HRB 32895Bobritzsch-Hilbersdorf, Sachsen

Owner. A joint venture of Jungheinrich and Triathlon. From the owner’s own publication. Evidence: Jungheinrich press release, 18 January 2022: "The joint venture of Jungheinrich and Triathlon". Checked 16 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

Owner, as publishedJT Energy Systems, joint venture of Jungheinrich and Triathlon Jungheinrich press release, 18 January 2022
Built byPlanned and built by Tricera Energy GmbH Jungheinrich press release, 18 January 2022
Power, as the owner gives it25 peak Jungheinrich press release, 18 January 2022
In operation, as the owner gives itOfficially opened on 30 September (year not shown; completion had been scheduled for autumn 2022) Sunlight Group (Triathlon) news
Also publishedUses second-life lithium-ion modules alongside new modules Jungheinrich press release, 18 January 2022

From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.

Where it connects

Grid companyMitteldeutsche Netzgesellschaft Strom mbH
Connected atmedium voltage
MunicipalityBobritzsch-Hilbersdorf, district of Mittelsachsen
StateSachsen
Registered position50.9243, 13.3977
Register locationSEL957808361362

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 5 September 2025; last changed in the register on 3 February 2026. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.