Batteriespeicher Neurath
80 MW, 84 MWh (1.1 hours) in Grevenbroich, Nordrhein-Westfalen, registered as operating since 13 February 2025. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.
What it is
The register holds this battery as one unit.
| Unit | Register number | MW | MWh | Commissioned | Battery | Grid operator check |
|---|---|---|---|---|---|---|
| Batteriespeicher Neurath | SEE993116568932 | 80 | 84 | 13 February 2025 | Lithium | checked |
Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.
Who runs it and who owns it
| Operator in the register | Commercial register entry, as the operator gave it | Seat |
|---|---|---|
| RWE Generation SE | Amtsgericht Essen HRB 24353 | Essen, Nordrhein-Westfalen |
Owner. RWE AG, Essen. From the owner’s own publication. Evidence: RWE press release, 14 February 2025: "RWE setzt die Batteriespeicher auf verschiedenen Energiemärkten ein.". Checked 16 October 2026. Every battery of this family.
The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.
Who trades it and what it is built from
| Owner, as published | RWE (RWE Generation SE) RWE press release, 14 February 2025 |
| Trades its output | Self-marketed: RWE deploys the battery in several energy markets itself RWE press release, 14 February 2025 |
| Built by | RWE in-house: planning, modelling, system integration and commissioning done by RWE itself RWE press release, 31 May 2023 |
| Power, as the owner gives it | 80 MW RWE press release, 14 February 2025 |
| Energy, as the owner gives it | 84 MWh RWE press release, 14 February 2025 |
| In operation, as the owner gives it | 2025-02-14 RWE announced Hamm and Neurath in operation (220 MW / 235 MWh in total); no separate Neurath date given RWE press release, 14 February 2025 |
| In operation, as the owner gives it | RWE commissioned the Hamm and Neurath storage in December 2024 and February 2025 (Neurath 2025-02, inferred from the Hamm December date in the 2025-02-14 release) our inference RWE project page |
| Also published | 250 battery blocks of eight lithium-ion modules each on 7,500 m2; cell maker not named RWE press release, 18 December 2023 |
From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.
Where it connects
| Grid company | Amprion GmbH |
| Connected at | high voltage (110 kV) |
| Municipality | Grevenbroich, district of Rhein-Kreis Neuss |
| State | Nordrhein-Westfalen |
| Permit | BR Düsseldorf, 54.07-1025/2021 |
| Registered position | 51.0376, 6.6123 |
| Register location | SEL906761618877 |
As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.
What has changed in the register
First registered on 17 February 2025; last changed in the register on 17 February 2025. No change has shown in our reads since the first, on 10 October 2026.
What this page cannot show
Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.
Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.