101 MW, 198 MWh (2 hours) in Arzberg, Bayern, registered as operating since 7 April 2025. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as two units.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
BESS - DE - ARZBERG - GMROSEE90990821998250997 April 2025Lithiumunder check
BESS - DE - ARZBERG - GMRWSEE97181523952050991 December 2025Lithiumunder check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
MW Storage NOB GmbHAmtsgericht Hof HRB 6769Wunsiedel, Bayern

Owner. MW Storage AG, Switzerland, with its MW Storage Fund and Reichmuth Infrastructure; Bayernwerk and ZukunftsEnergie Nordostbayern also invested. From the owner’s own publication. Evidence: Bayernwerk press release of 10 November 2024 on the Arzberg battery and its investors; shareholder list not read. Checked 11 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

Owner, as publishedMW Storage Fund with majority shareholder Reichmuth Infrastructure as anchor investors; Bayernwerk and ZENOB also invested Bayernwerk press release, 10 November 2024
Owner’s parentBayernwerk (minority investor) is a 100% subsidiary of E.ON Bayernwerk press release, 10 November 2024
Owner’s parentMW Storage Fund is mainly backed by Reichmuth Infrastructure and MW Storage; Bayernwerk and ZENOB are minority investors Energy-Storage.News, 17 March 2025
Trades its outputEntrix commercialises 50 MW / 100 MWh, half the plant; MW Storage has not said who markets the other half; toll or merchant not disclosed Energy-Storage.News, 17 March 2025
Built byFluence Energy GmbH selected to deliver the project Fluence press release, 14 February 2024
Battery systemFluence Fluence press release, 14 February 2024
Power, as the owner gives it100 MW Bayernwerk press release, 10 November 2024
Energy, as the owner gives it200 MWh Bayernwerk press release, 10 November 2024
In operation, as the owner gives it2024-11-08 official inauguration (register first commissioning date is 2025-04-07) Bayernwerk press release, 10 November 2024
In operation, as the owner gives itDue to be commissioned in April 2025 (2025-04), per Energy-Storage.News in March 2025 Energy-Storage.News, 17 March 2025
In operation, as the owner gives it2024-11-08 official inauguration ESS News

From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.

Where it connects

Grid companyBayernwerk Netz GmbH
Connected athigh voltage (110 kV)
MunicipalityArzberg, district of Wunsiedel i. Fichtelgebirge
StateBayern
PermitLandratsamt Wunsiedel im Fichtelgebirge, 41–253/2023; Landratsamt Wunsiedel im Fichtelgebirge, 43-632/00
Registered position50.0565, 12.1430
Register locationSEL915834154051, SEL952548315668

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 17 November 2025; last changed in the register on 26 September 2026. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.