BESS Krumpa I

46 MW, 102 MWh (2.2 hours) in Braunsbedra, Sachsen-Anhalt, registered as operating since 29 January 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
BESS Krumpa ISEE9740383819464610229 January 2026Lithiumunder check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
Münch EnerStore GmbHAmtsgericht Bayreuth HRB 8429Rugendorf, Bayern

Owner. Münch Gruppe, Rugendorf (family business; owners not named), through Münch group, presumed. Inferred: the operator shares a company address with this family, and its own entry was not read. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

Owner, as publishedOwner not revealed by CNTE; registries point to Münch Energie Energy-Storage.News, 26 August 2026
Battery systemCNTE supplied 50.94 MW / 101.592 MWh of BESS equipment; CNTE did not name the owner Energy-Storage.News, 26 August 2026
Battery systemCNTE had earlier supplied the storage system for BESS Krumpa I CNTE press release (PR Newswire), 28 August 2026
Power, as the owner gives it50.94 (CNTE equipment rating; register holds 46.3 MW) Energy-Storage.News, 26 August 2026
Energy, as the owner gives it101.592 MWh Energy-Storage.News, 26 August 2026
In operation, as the owner gives itConnected to the grid in April 2026 (2026-04), per CNTE; register first commissioning 2026-01-29 Energy-Storage.News, 26 August 2026
Also publishedKrumpa I is part of the Münch Leuna-Krumpa cluster; register lists it separately from the Leuna/Merseburg group though pv magazine reports the cluster as one 250 MW, five-part plant our inference pv magazine Deutschland, 13 August 2026
Also publishedInferred: Suena markets three 49.5 MW / 101 MWh Münch assets; Krumpa I (101.6 MWh in register, 101.592 MWh from CNTE) matches that size and may be one of them; no source names the three our inference ESS News, 25 March 2026

From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.

Where it connects

Grid companyMitteldeutsche Netzgesellschaft Strom mbH
Connected atthe high to medium voltage transformer level
MunicipalityBraunsbedra, district of Saalekreis
StateSachsen-Anhalt
Land parcelKrumpa, Flur 6, Flurstück 566
Registered position51.2891, 11.8477
Register locationSEL938773599592

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 9 February 2026; last changed in the register on 11 August 2026. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.