BESS Strübbel

50 MW, 112 MWh (2.2 hours) in Schülp, Schleswig-Holstein, registered as operating since 28 January 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
BESS StrübbelSEE9635142475485011228 January 2026Lithiumchecked

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
BESS StrübbelAmtsgericht Hamburg HRA 126563Hamburg, Hamburg

Owner. Pangion Holding S.à r.l., Luxembourg (not traced further); Aquila developed the plant, through Pangion Holding S.à r.l., Wecker, Luxembourg (B224973), sole limited partner. Confirmed in the commercial register. Evidence: Current printout (AD) of Amtsgericht Hamburg HRA 126563, retrieved 11 October 2026; last entry 11 January 2024. Checked 11 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

Owner, as publishedAquila Clean Energy EMEA project Energy-Storage.News, 20 November 2024
Trades its outputEntrix, full-stack optimisation including FCR, aFRR, day-ahead and wholesale trading; term not stated Energy-Storage.News, 20 November 2024
Built byH&MV Engineering (construction / balance-of-plant contractor) Energy-Storage.News, 20 November 2024
Built byH&MV Engineering as BOP contractor Trina Storage press release, 21 November 2024
Battery systemTrina Storage supplies and integrates the LFP system (Elementa), with an 18-year service agreement Energy-Storage.News, 20 November 2024
Battery systemTrina Storage, complete BESS based on its Elementa system, with an 18-year service agreement Trina Storage press release, 21 November 2024
Power, as the owner gives it50 MW Energy-Storage.News, 20 November 2024
Energy, as the owner gives it100 (register holds 112 MWh) Energy-Storage.News, 20 November 2024
In operation, as the owner gives itExpected to go live in 2025 (Trina, November 2024); register first commissioning 2026-01-28 Trina Storage press release, 21 November 2024

From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.

Where it connects

Grid companySchleswig-Holstein Netz GmbH
Connected athigh voltage (110 kV)
MunicipalitySchülp, district of Dithmarschen
StateSchleswig-Holstein
Registered position54.2581, 8.9407
Register locationSEL920534555527

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 7 August 2026; last changed in the register on 6 October 2026.

SeenUnitWhat changedFromTo
13 October 2026BESS StrübbelGrid operator checkunder checkchecked
15 October 2026BESS StrübbelGrid operator checkunder checkchecked

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.