BESS Strübbel
50 MW, 112 MWh (2.2 hours) in Schülp, Schleswig-Holstein, registered as operating since 28 January 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.
What it is
The register holds this battery as one unit.
| Unit | Register number | MW | MWh | Commissioned | Battery | Grid operator check |
|---|---|---|---|---|---|---|
| BESS Strübbel | SEE963514247548 | 50 | 112 | 28 January 2026 | Lithium | checked |
Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.
Who runs it and who owns it
| Operator in the register | Commercial register entry, as the operator gave it | Seat |
|---|---|---|
| BESS Strübbel | Amtsgericht Hamburg HRA 126563 | Hamburg, Hamburg |
Owner. Pangion Holding S.à r.l., Luxembourg (not traced further); Aquila developed the plant, through Pangion Holding S.à r.l., Wecker, Luxembourg (B224973), sole limited partner. Confirmed in the commercial register. Evidence: Current printout (AD) of Amtsgericht Hamburg HRA 126563, retrieved 11 October 2026; last entry 11 January 2024. Checked 11 October 2026. Every battery of this family.
The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.
Who trades it and what it is built from
| Owner, as published | Aquila Clean Energy EMEA project Energy-Storage.News, 20 November 2024 |
| Trades its output | Entrix, full-stack optimisation including FCR, aFRR, day-ahead and wholesale trading; term not stated Energy-Storage.News, 20 November 2024 |
| Built by | H&MV Engineering (construction / balance-of-plant contractor) Energy-Storage.News, 20 November 2024 |
| Built by | H&MV Engineering as BOP contractor Trina Storage press release, 21 November 2024 |
| Battery system | Trina Storage supplies and integrates the LFP system (Elementa), with an 18-year service agreement Energy-Storage.News, 20 November 2024 |
| Battery system | Trina Storage, complete BESS based on its Elementa system, with an 18-year service agreement Trina Storage press release, 21 November 2024 |
| Power, as the owner gives it | 50 MW Energy-Storage.News, 20 November 2024 |
| Energy, as the owner gives it | 100 (register holds 112 MWh) Energy-Storage.News, 20 November 2024 |
| In operation, as the owner gives it | Expected to go live in 2025 (Trina, November 2024); register first commissioning 2026-01-28 Trina Storage press release, 21 November 2024 |
From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.
Where it connects
| Grid company | Schleswig-Holstein Netz GmbH |
| Connected at | high voltage (110 kV) |
| Municipality | Schülp, district of Dithmarschen |
| State | Schleswig-Holstein |
| Registered position | 54.2581, 8.9407 |
| Register location | SEL920534555527 |
As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.
What has changed in the register
First registered on 7 August 2026; last changed in the register on 6 October 2026.
| Seen | Unit | What changed | From | To |
|---|---|---|---|---|
| 13 October 2026 | BESS Strübbel | Grid operator check | under check | checked |
| 15 October 2026 | BESS Strübbel | Grid operator check | under check | checked |
What this page cannot show
Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.
Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.