Vitreous LabsEnergy transparency

ECO POWER ONE

104 MW, 239 MWh (2.3 hours) in Bollingstedt, Schleswig-Holstein, registered as operating since 13 March 2025. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as two units.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
ECO POWER ONE CDSEE9221582610375211913 March 2025Lithiumchecked
ECO POWER ONE ABSEE9255436215155211913 March 2025Lithiumchecked

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
ECO POWER ONE GmbHAmtsgericht München HRB 277836Kirchheim, Bayern

Owner. Alpiq Holding AG, Switzerland, through Alpiq Energie Deutschland GmbH, Berlin (Amtsgericht Charlottenburg HRB 199794 B), 100 %. Confirmed in the commercial register. Evidence: Shareholder list of ECO POWER ONE GmbH filed 27 August 2026 (Amtsgericht München HRB 277836); sale reported at solarserver.de. Eco Stor sold the company to Alpiq Energie Deutschland GmbH: notarial deed of 4 August 2026, new shareholder list filed 27 August 2026 (Bollingstedt, 103.5 MW) Checked 11 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

Owner, as publishedAlpiq acquired the battery from ECO STOR; release dated 2026-08-25 Alpiq media release, 25 August 2026
Owner, as publishedAlpiq Energie Deutschland GmbH buys Bollingstedt from Eco Stor GmbH; Eco Stor stays responsible for technical and operational management solarserver, 26 August 2026
Owner’s parentAlpiq (Swiss energy group), via Alpiq Energie Deutschland GmbH solarserver, 26 August 2026
Trades its outputenspired optimises ECO POWER ONE in wholesale and ancillary markets (page still describes ECO STOR as owner); not confirmed after the Alpiq sale enspired case study, 10 September 2026
Built byBuilt by Eco Stor with project developer EPW ESS News, 6 June 2025
Built byEco Stor acted as EPC and developer Energy-Storage.News, 30 April 2024
Power, as the owner gives it103.5 MW Alpiq media release, 25 August 2026
Energy, as the owner gives it238 (Alpiq); enspired gives 238.5 Alpiq media release, 25 August 2026
In operation, as the owner gives itIn operation since June 2025 (2025-06) per Alpiq Alpiq media release, 25 August 2026
In operation, as the owner gives itOnline since April 2025, official inauguration on Thursday 2025-06-05 ESS News, 6 June 2025
In operation, as the owner gives itBrought online in July 2025 (2025-07) per Energy-Storage.News; conflicts with Alpiq (June) and ESS News (April) Energy-Storage.News, 26 August 2026
Also publishedEco Stor remains responsible for technical and operational management after the sale solarserver, 26 August 2026
Also publishedCell maker not published: Cell maker not named; LFP chemistry enspired case study, 10 September 2026

From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.

Where it connects

Grid companySchleswig-Holstein Netz GmbH
Connected athigh voltage (110 kV)
MunicipalityBollingstedt, district of Schleswig-Flensburg
StateSchleswig-Holstein
Land parcelGammellund, Flur15: 88
Registered position54.5773, 9.4740
Register locationSEL925943845900, SEL993942454935

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 25 March 2025; last changed in the register on 20 May 2026. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.