Vitreous LabsEnergy transparency

Inno BESS Hallbergmoos

6.5 MW, 14 MWh (2.2 hours) in Hallbergmoos, Bayern, registered as operating since 17 July 2025. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as two units.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Inno BESS HallbergmoosSEE9128969867123.5817 July 2025Lithiumchecked
BESS Trading HallbergmoosSEE99719695394736.129 October 2025Lithiumunder check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
VSP 29 GmbH & Co. KGAmtsgericht München HRA 109909München, Bayern

Owner. VISPIRON GmbH, München (Amtsgericht München HRB 176891); its own shareholders were not checked, through a VISPIRON company, presumed. Inferred: the operator shares a company address with this family, and its own entry was not read. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyBayernwerk Netz GmbH
Connected atmedium voltage
MunicipalityHallbergmoos, district of Freising
StateBayern
Land parcelHallbergmoos, 811/3
Registered position48.3363, 11.7252
Register locationSEL962857803404, SEL983978431697

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

Tender award

UnitAwardAnnouncedBidderMW bid
Inno BESS HallbergmoosInn24-1/02710 July 2024VSP 29 GmbH & Co. KG14

The innovation tenders pay a market premium to solar or wind paired with storage. The award lists are the Bundesnetzagentur’s. A bidder that differs from today’s operator dates a change of hands, or a spelling difference.

What has changed in the register

First registered on 17 September 2025; last changed in the register on 18 March 2026. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.