Vitreous LabsEnergy transparency

Partition batteries, Leipzig

14 MW, 15 MWh (1.1 hours) in Leipzig, Sachsen, registered as operating since 1 September 2017. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as four units.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Partition_3SEE9056477538623.43.91 September 2017Lithiumchecked
Partition_4SEE9435652179363.43.91 September 2017Lithiumunder check
Partition_2SEE9543514623553.43.91 September 2017Lithiumchecked
Partition_1SEE9864182524183.43.91 September 2017Lithiumunder check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
BMW AGAmtsgericht München HRB 42243München, Bayern

Owner. BMW AG. From the owner’s own publication. Evidence: BMW Group fact sheet, Battery Storage Farm Leipzig, c. 2017-18 (undated): "The BMW Battery Storage Farm Leipzig commands up to 10MW of marketable power and up to 15MWh of marketable capacity.". Checked 16 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyMitteldeutsche Netzgesellschaft Strom mbH
Connected athigh voltage (110 kV)
MunicipalityLeipzig
StateSachsen
Registered position51.4112, 12.4482
Register locationSEL976606884941

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 16 July 2020; last changed in the register on 1 April 2026. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.