10 MW, 13 MWh (1.3 hours) in Ohrdruf, Thüringen, registered as operating since 26 July 2024. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
PES OhrdrufSEE930847992643101326 July 2024Lithiumchecked

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
PES Ohrdruf GmbH & Co KGAmtsgericht Mannheim HRA 710895Waghäusel, Baden-Württemberg

Owner. Wirth-Gruppe (Waghäusel), through W Power, a Wirth-Gruppe company. Reported in the trade press and not yet confirmed by the owner or the commercial register. Evidence: Solarserver, 9 August 2024: "Investor ist die baden-württembergische Wirth-Gruppe.". Checked 16 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyTEN Thüringer Energienetze GmbH & Co. KG
Connected atmedium voltage
MunicipalityOhrdruf, district of Gotha
StateThüringen
Registered position50.8339, 10.7312
Register locationSEL972144322631

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 31 July 2024; last changed in the register on 1 October 2025. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.