Vitreous LabsEnergy transparency

Reutern - BESS 1

4.5 MW, 8.9 MWh (2 hours) in Welden, Bayern, registered as operating since 2 April 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Reutern - BESS 1SEE9857429003854.58.92 April 2026Lithiumunder check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
Energiebauern GmbH & Co. Kraftwerke KGAmtsgericht Augsburg HRA 16433Sielenbach, Bayern

Owner. Energiebauern GmbH, Sielenbach (Amtsgericht Augsburg HRB 20289); its own shareholders were not checked; private individuals hold part of one older company, through a private individual, contribution 50,000 euros; a private individual, contribution 55,000 euros; a private individual, contribution 50,000 euros; Energiebauern GmbH, Sielenbach (Amtsgericht Augsburg HRB 20289), contribution 830,000 euros; a private individual, contribution 60,000 euros; a private individual, contribution 110,000 euros. Confirmed in the commercial register. Evidence: Current printout (AD) of Amtsgericht Augsburg HRA 16433, retrieved 11 October 2026; last entry 12 February 2026. Checked 11 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companyLEW Verteilnetz GmbH
Connected atmedium voltage
MunicipalityWelden, district of Augsburg
StateBayern
Land parcelReutern, Flurstücksnummer: 398
Registered position48.4637, 10.6358
Register locationSEL984512528583

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

Tender award

UnitAwardAnnouncedBidderMW bid
Reutern - BESS 1Inn23-2/0505 October 2023Energiebauern GmbH & Co. Kraftwerke KG11

The innovation tenders pay a market premium to solar or wind paired with storage. The award lists are the Bundesnetzagentur’s. A bidder that differs from today’s operator dates a change of hands, or a spelling difference.

What has changed in the register

First registered on 2 April 2026; last changed in the register on 2 April 2026. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.