Speicher Beilrode
150 MW, 315 MWh (2.1 hours) in Beilrode, Sachsen, registered as operating since 15 November 2024. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.
What it is
The register holds this battery as six units.
| Unit | Register number | MW | MWh | Commissioned | Battery | Grid operator check |
|---|---|---|---|---|---|---|
| Beilrode - BESS - CoLocation 1 | SEE987129678436 | 76 | 152 | 14 July 2026 | Lithium | under check |
| Beilrode - BESS - CoLocation 2 | SEE913072031325 | 45 | 89 | 1 June 2026 | Lithium | under check |
| Speicher Beilrode II - Teilanlage 1 | SEE913483427694 | 10 | 26 | 17 March 2025 | Lithium | checked |
| Speicher Beilrode I - Teilanlage 1 | SEE943109815024 | 7.2 | 18 | 15 November 2024 | Lithium | checked |
| Speicher Beilrode I - Teilanlage 6 | SEE900310540558 | 5.6 | 14 | 1 May 2025 | Lithium | checked |
| Speicher Beilrode I - Teilanlage 5 | SEE939346315557 | 5.6 | 14 | 1 April 2025 | Lithium | under check |
Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.
Who runs it and who owns it
| Operator in the register | Commercial register entry, as the operator gave it | Seat |
|---|---|---|
| Solarpark Beilrode GmbH & Co. KG | Amtsgericht Leipzig HRA 18827 | Beilrode, Sachsen |
We have not yet traced the owner behind this operator. The commercial register holds it, and the owners page lists every family traced so far.
The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.
Who trades it and what it is built from
| Also published | The citizen subordinated loan to Solarpark Beilrode GmbH & Co. KG (PV park of about 100 ha with battery storage, in operation) is offered by Energietechnik Bichler GmbH; the page does not state the owner or battery size Solarpark Beilrode citizen-loan page (eueco platform) |
From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.
Where it connects
| Grid company | Mitteldeutsche Netzgesellschaft Strom mbH |
| Connected at | high voltage (110 kV) |
| Municipality | Beilrode, district of Nordsachsen |
| State | Sachsen |
| Land parcel | Beilrode, Flur 2 - Flurstücksnummer: 180; Beilrode, Flur 2. Flurstücksnummer 192 |
| Registered position | 51.5730, 13.0904 |
| Register location | SEL902755179263, SEL908814392086, SEL911896408071, SEL924800743182, SEL940363401338, SEL942644085503 |
As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.
Tender award
| Unit | Award | Announced | Bidder | MW bid |
|---|---|---|---|---|
| Speicher Beilrode II - Teilanlage 1 | Inn23-2/053 | 5 October 2023 | Solarpark Beilrode GmbH & Co. KG | 40 |
| Speicher Beilrode I - Teilanlage 1 | Inn22-1/023 | Solarpark Beilrode GmbH & Co. KG | 0 | |
| Speicher Beilrode I - Teilanlage 6 | Inn24-2/150 | 22 October 2024 | Solarpark Beilrode GmbH & Co. KG | 21 |
| Speicher Beilrode I - Teilanlage 5 | Inn24-2/147 | 22 October 2024 | Solarpark Beilrode GmbH & Co. KG | 23 |
The innovation tenders pay a market premium to solar or wind paired with storage. The award lists are the Bundesnetzagentur’s. A bidder that differs from today’s operator dates a change of hands, or a spelling difference.
What has changed in the register
First registered on 15 November 2024; last changed in the register on 14 October 2026.
| Seen | Unit | What changed | From | To |
|---|---|---|---|---|
| 15 October 2026 | Speicher Beilrode I - Teilanlage 5 | Net power | 6.2 MW | 5.6 MW |
What this page cannot show
Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.
Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.